Delivery

Posted on Sep 12, 2012 in Millwork, Stairs, Woodwork
Delivery

Delivered the finished stair halves for the upper run today of the double-helix!  The weather was perfect and we were able to get the pieces into the home to acclimate before installation.  It was a pretty amazing sight to see the stair on the flat-bed going down the freeway!  Lots of people staring and pointing.  It was a pretty simple operation once we got to the home; the all-terrain forklift put it right on the floor we needed and we moved it into the house from there.  We plan on pulling down the lower run and delivering it early next week, then we get to fit the rest of the ferrum balustrade!